Reference Sludge Treatment:

Sludge Incineration Plant Lünen, Germany

Client: Innovatherm Gesellschaft zur Nutzung von Brennstoffen mbH
Period: 2015 – 2020

Project Description

Construction of a sewage sludge drying plant as an extension to the existing sewage sludge incineration plant on the INNOVATHERM site in Lünen includes:

  • Sludge reception and storage, vapor condensate treatment and exhaust air treatment and re-installation of a cooling water circuit
  • Drying sewage sludge to achieve the required quality for mono-incineration

Our Services

Feasibility study and detailed design for the installation of a sludge receiving and storage plant and a multi-line (5 duty+1 standby) mechanical sludge drying plant with a capacity of 480,000tDS/a upstream of the ex. Incineration lines

  • Planning functional tendering
  • Project planning construction, technical equipment; EMSR and technical building equipment
  • Structural planning