Reference Sludge Treatment:

Sludge Incineration Plant WWTP Tubli, Bahrain

Client: Ministry of Works, Kingdom of Bahrain
Period: 2012 – 2022

Project Description

Extension of the WWTP Tubli to 400,000 m³/d with sludge disposal by dewatering, partial drying and incineration

  • Installation of 3rd Thermal Drying Line consisting of Sludge Dewatering and Drying (Turbo-Dryer) inside the existing plant
  • Upgrading of Sludge Thickening & Dewatering Systems
  • Design and Tender Documents for a Sludge Incineration Plant with a sludge processing capacity of 110 tDS/d
  • Development of a full Waste to Energy recovery concept with electricity generation as part of the Sludge Incineration Plant

Our Services

  • Design
  • Tendering
  • Supervision