Reference Sewer Systems:

East Zarqa Wastewater Project, Jordan

Client: Water Authority Jordan (WAJ)
Ministry of Water and Irrigation (MWI)
Period: since 2017

Project Description

The objectives of the Program will focus on decrease or even eliminate the sewage overflows in the existing System in Zarqa Governorate of Jordan by following measures:

  • Construction of a new Force Main (DN 900 mm, 9 km) from East Zarqa Pumping Station to As-Samra Waste Water Treatment Plant (WWTP)
  • Refurbishment of the existing Force Main (DN 500 mm, 7.4 km) from East Zarqa Pumping Station to As-Samra Waste Water Treatment Plant (WWTP).

Our Services

  • Construction Supervision for the new force main and the rehabilitation of the existing force main
  • Reporting to the WAJ and the EBRD
  • General Assistance to WAJ
  • Acting as Clients Engineer in all works contracts (according to FIDIC Red Book)