Reference Sewer Systems:
East Zarqa Wastewater Project, Jordan
Client: | Water Authority Jordan (WAJ) Ministry of Water and Irrigation (MWI) |
Period: | since 2017 |
Project Description
The objectives of the Program will focus on decrease or even eliminate the sewage overflows in the existing System in Zarqa Governorate of Jordan by following measures:
- Construction of a new Force Main (DN 900 mm, 9 km) from East Zarqa Pumping Station to As-Samra Waste Water Treatment Plant (WWTP)
- Refurbishment of the existing Force Main (DN 500 mm, 7.4 km) from East Zarqa Pumping Station to As-Samra Waste Water Treatment Plant (WWTP).
Our Services
- Construction Supervision for the new force main and the rehabilitation of the existing force main
- Reporting to the WAJ and the EBRD
- General Assistance to WAJ
- Acting as Clients Engineer in all works contracts (according to FIDIC Red Book)