Reference Sewer Systems:

Main Sewer System and Sewage Treatment Plant Muharraq, Bahrain

Client: Ministry of Works, Bahrain
Contractor: Samsung
Period: 2012 – 2015

Project Description

  • BOO model for Sewage Treatment Plant 100,000 m³/d
  • BOOT model for Deep Gravity Sewer as Main Sewer with length of 16 km, diameter 800 – 1.800 mm and depth up to 15 m
  • Decommissioning of 24 pumping stations

Our Services

Clients Engineer for Ministry of Works

  • Review of contractors detailed design
  • Supervision of construction and commissioning
  • Quality control, time and cost management
Reference Main Sewer Muharraq Bahrain