Reference Sludge Treatment:
Sludge Incineration Plant Lünen, Germany
Client: | Innovatherm Gesellschaft zur Nutzung von Brennstoffen mbH |
Period: | 2015 – 2020 |
Project Description
Construction of a sewage sludge drying plant as an extension to the existing sewage sludge incineration plant on the INNOVATHERM site in Lünen includes:
- Sludge reception and storage, vapor condensate treatment and exhaust air treatment and re-installation of a cooling water circuit
- Drying sewage sludge to achieve the required quality for mono-incineration
Our Services
Feasibility study and detailed design for the installation of a sludge receiving and storage plant and a multi-line (5 duty+1 standby) mechanical sludge drying plant with a capacity of 480,000tDS/a upstream of the ex. Incineration lines
- Planning functional tendering
- Project planning construction, technical equipment; EMSR and technical building equipment
- Structural planning