Loading...
Reference Wastewater Disposal Tubli, Bahrain2018-10-25T16:05:20+00:00

Reference Wastewater Diposal:

Wastewater Treatment Plant Tubli, Bahrain

Client: Ministry of Works, Bahrain
Period: since 2007

Project Description

The wastewater treatment plant (WWTP) in Tubli is the main plant of the Kingdom of Bahrain. It is structurally in poor condition. Therefore Extension and rehabilitation of WPCC from 200,000 m³/d to 400,000 m³/d is planned.  Measures implemented by p2m inthe past:

  • 2007 – 2008: Design for an upgrade of Tubli WPCC to 350,000 m³/d capacity
  • 2008 – 2010: Bahrain Master Plan for Sanitary Engineering
  • 2009 – 2011: Short Term Measures part 1
  • 2010 – 2013: Implementation of HYBACS Process
  • 2011 – 2012: Short Term Measures part 2
  • 2012 – to date: Consulting Services for the Extension

Our Services

  • Feasibility study
  • Basic design
  • DBO Tendering
  • Environmental Impact Assessment
  • Supervision of Construction
Back to overview